Company intelligence
Magnum Piering
About Magnum Piering
One of the first manufactures of foundation repair systems in the United States, Magnum Piering has a 35-year legacy producing high quality deep foundation products. Beginning with its flagship line of hydraulic push piering systems, Magnum has gone on to become recognized by contractors as the most reliable and efficient producer of underpinning and deep foundation products. In 2016, Magnum opened a 145,000 sqft. manufacturing plant and world headquarters in West Chester Ohio. This facility has state of the art streel fabrication equipment and accompanies a large staff of highly qualified craftsman to produce large orders and large products within a structure of efficiency and timely delivery. In addition, the warehouse space provides customers with a lager supply of ready inventory that can be shipped on demand. Magnum’s Helical Pile product line, first introduced in 2001, was engineered and developed by it’s own product development team. Magnum Helical Piles are now specified by engineers for a multitude of applications such as bridges, boardwalks, houses, wind turbines, oil and gas equipment, and multi-story buildings. This success is due not only to Magnums vison of the industries technology, but due in part to the quality put into every product Magnum makes. ISO 9001 accredited, Magnum has established and maintaines the uniform quality management system standards set forth by The International Organization for Standardization (ISO). In addition, all of Magnum’s helical pile products have been designed to meet or exceed ICC-ES AC358 criteria. Magnum uses both an internal quality assurance testing program and an outside, independent IAS accredited laboratory to conduct product testing in accordance with AC358. ICC-ES evaluation under the AC358 criteria means that Magnum’s products meet or exceed the most up-to-date industry standards, creating a high level of assurance that the product will perform as designed.
Verified activity
Signals from Magnum Piering
4 published signals
Operations & Supply
Magnum Piering successfully completed the Life Care Center of Stonegate in Parker, CO, a one-story facility requiring reliable foundation support with strict settlement limits, completed in 25 working days.
Reported by Magnum Piering
Operations & Supply
Magnum Piering successfully completed the Life Care Center of Stonegate in Parker, CO, a one-story facility requiring reliable foundation support with strict settlement limits, in 25 working days.
Reported by Steve Fine
Operations & Supply
Magnum Piering used helical piles on a medical office project in Durango, Colorado, to navigate limited site access and work with smaller equipment.
Reported by Magnum Piering
Operations & Supply
Magnum Piering used helical piles on a medical office project in Durango, Colorado, to navigate limited site access and work with smaller equipment.
Reported by Steve Fine