basesite reduced the cost of cable by $5M on one fab with the same design and better data
Public source
Publisher name
Public post
$5M less cable on one fab. Same design, better data. Team basesite
Company
basesite
Transform Construction Projects with Process Facility Digital Twins
- Industry
- Technology, Information and Internet
- Location
- Kildare, IE
- Company size
- 11–50 employees
About basesite
Basesite builds engineering led software for advanced technology facilities, helping owners, designers, builders, and operators manage complexity across capital intensive projects. Our platforms create structured and connected digital representations of facilities, bringing together engineering data, constraints, and dependencies to support confident decision making across design, construction, and operations. By turning fragmented inputs into validated and usable data, we help teams improve installation readiness, reduce rework, and lower delivery risk. Basesite solutions are used to optimize utility and infrastructure scope, validate layouts and hook ups, and maintain continuity from design through execution. This approach has delivered measurable results across global programs, including significant cost reductions, multimillion euro annual savings, and repeatable per facility impact across semiconductor and advanced manufacturing projects in the US, EMEA, and APAC. Grounded in real project delivery, our multidisciplinary teams combine deep construction engineering expertise with modern software development to support complex facilities worldwide. Basesite is ISO 27001 certified and is a member of SEMI, Silicon Saxony, and Enterprise Ireland.
See moreLatest activity
Latest activity from basesite
2 signals
Discover more
Similar signals
Similar public activity from other companies.
Operations & Supply
Principle Services, LLC
Principle Services, LLC achieved 99% cost accuracy and finished 1% under the approved CCN budget on a $450M+ utility program through disciplined project controls, budget monitoring, and integrated construction and outage scheduling.
Operations & Supply
TraceAir Technologies
TraceAir Technologies used weekly aerial scans to catch a 30,000 cy discrepancy before it became a $1M problem.
Operations & Supply
Qnect
Qnect connected and optimized Mass General Hospital Phase 1 for structural engineering.
Operations & Supply
Alitek Solutions
Alitek Solutions helped a leading LNG exporter achieve over $1 million in annual savings, a 90% reduction in review time, and zero additional headcount by replacing spreadsheets and manual transmittal reviews with an automated process.
Operations & Supply
DYWIDAG