Emotive Architecture completed the structural shift from a concrete superstructure to a hybrid system combining light gauge framing and concrete deck for The Rutherford, an 8-story condominium building in Washington, DC.
Public source
Publisher name
Public post
Early in his career, Aubrey Grant worked on The Rutherford, an 8-story condominium building in Washington, DC. As material costs spiked during design development, the ow…
Company
Emotive Architecture
Belief in the Possible!
- Industry
- Architecture and Planning
- Location
- Washington, US
- Company size
- 2–10 employees
About Emotive Architecture
Since its inception, Emotive Architecture has been creating some of the most aesthetically functional structures in the greater Washington D.C. Region. Across all projects, we design with humans and goals in mind. Our team works in land-use entitlement to showcase our commitment to the urban arena. The result is a well-executed building connecting to the city’s fabric and intended mission. We partner on every aspect of the project. Integrated design and management ensure a seamless process for delivering projects on time and within budget. From land-use entitlement to bidding documents, we are your ally in navigating the complicated strategic process required to attain a successful completion. While architectural design is our business, communication is our distinction. We proudly curate a relationship with each client focused on measurable goals.
See moreLatest activity
Latest activity from Emotive Architecture
2 signals
Discover more
Similar signals
Similar public activity from other companies.
Operations & Supply
Grace Design Studios
Grace Design Studios built a 6,000 square foot workplace for DH Engineering that supports communication, wellness, and innovation through architecture, open spaces, operable walls, and outdoor connections.
Operations & Supply
Triad Architects
Triad Architects delivered the Midnimo Cross Cultural Middle School using modular construction alongside the existing Cesar Chavez elementary, managing a budget and schedule that were too tight for conventional construction.
Operations & Supply
Rise Architecture
Rise Architecture lowered the steel to the second floor to carry the midpoint roof load due to the depth of the Ezras Nashim to avoid a full cantilevered overhang and simplify the roof truss system above.
Operations & Supply
BASE4 - Architects, Engineers, Designers
BASE4 - Architects, Engineers, Designers achieved consistent layouts, structure, and MEP systems across the Fuze520 Development in Maricopa, AZ.
Operations & Supply
Baskervill