Inside Outside Engineering provided data showing that before external shading interventions, the school's outside temperature reached 23C in May while the inside temperature exceeded 30C.
Published
Signal category
Products & Services
Quote
“Before any external shading interventions: In May - Outside temp only reaching 23C. Inside temperature already reached or exceeded 30C.”
— Xin Jin|Inside Outside Engineering team
Company
Inside Outside Engineering
Enviromental MEP Engineering & Passivhaus Consultancy
- Industry
- Construction
- Location
- London, GB
- Company size
- 2 employees
We design everything that flows through a building; the heat, light, air, water, and electricity. We advise on building form and method of construction to minimise loads. The result is an efficient and elegant building. We look at the bigger picture, by using Passivhaus method, or Whole Life Carbon analysis for whole building analysis. We deliver to the fine detail; ie trouble shooting a major historic museum, or complex duct design to meet the exacting requirement for the 'high tech' style.