Book a demo
Products & ServicesEvent: September 4, 2026

Inside Outside Engineering provided data showing that before external shading interventions, the school's outside temperature reached 23C in May while the inside temperature exceeded 30C.

Published

Signal category

Products & Services

Quote

Before any external shading interventions: In May - Outside temp only reaching 23C. Inside temperature already reached or exceeded 30C.

Xin Jin|Inside Outside Engineering team

Company

Inside Outside Engineering

Enviromental MEP Engineering & Passivhaus Consultancy

Industry
Construction
Location
London, GB
Company size
2 employees

We design everything that flows through a building; the heat, light, air, water, and electricity. We advise on building form and method of construction to minimise loads. The result is an efficient and elegant building. We look at the bigger picture, by using Passivhaus method, or Whole Life Carbon analysis for whole building analysis. We deliver to the fine detail; ie trouble shooting a major historic museum, or complex duct design to meet the exacting requirement for the 'high tech' style.

Customize signals for your business.

Know everything happening across the B2B world, and act on the company movements that matter to you.

© 2026 SeedOpsCompany intelligence.

SeedOps.