NextGen Chip Design returned an ASIC design to its last stable clock configuration, applied controlled timing ECOs to remaining critical paths, and restored predictable convergence after a tape-out disaster.
Public source
Publisher name
Public post
Case study: Averting a tape-out disaster Six weeks before tape-out, an ASIC team’s backend flow had become unstable. Timing fixes created problems elsewhere and iteratio…
Company
NextGen Chip Design
ASIC Physical Design: Turning Ideas into Silicon
- Industry
- Semiconductor Manufacturing
- Location
- WINCHESTER, GB
- Company size
- 2–10 employees
About NextGen Chip Design
NextGen Chip Design is a UK-based specialist ASIC design services company providing best-in-class physical design (RTL to GDS) for digital and mixed signal ASICs. We pride ourselves on being the domain experts with extensive expertise across the complete physical implementation flow (RTL to GDS) and for digital blocks, IPs, subsystems, digital and analog mixed-signal ASICs for various applications including AI / ML, automotive, mobile, consumer electronics, sensors. Our long list of satisfied clients includes well-established semiconductor enterprises as well as the start-up ASIC / IP design companies at the forefront of technological innovation. We have strong connections with industry network partners and can offer the whole range of ASIC design solutions too including from architecture to silicon. To enquire more about our ASIC design services, get in touch on contact@nextgen-chipdesign.com
See moreLatest activity
Latest activity from NextGen Chip Design
2 signals
Discover more
Similar signals
Similar public activity from other companies.
Products & Services
Bruco IC
Bruco IC completed the tape-out of an ASIC for one of its partners, featuring a fast 25Gb/s fanout buffer, 4 inputs and 12 output drivers, an I2C communication bus for input-to-output mapping, and smart power management.
Products & Services
M31 Technology
M31 Technology designed all the Foundation IP with best in class quality and PPA
Products & Services
ASC Global
ASC Global helps customers bypass 26-week lead times for Analog & Power ICs through allocated component sourcing, proactive BOM analysis, custom stocking programs, and rigorous quality control.
Products & Services
ASM
ASM delivered high-volume manufacturing for transistor scaling and precursor chemistry breakthroughs.
Products & Services
Racyics