Oldcastle Infrastructure completed the stormwater detention installation for the Miramar Beach Resort on St Pete Beach using Empire Pipe and AJ Services of Tampa Bay, taking approximately 6 hours of set time.
Public source
Publisher name
Public post
Another great install in the books for the Oldcastle Storm Capture system. Miramar Beach Resort on St Pete Beach had very limited space but a need for onsite stormwater…
Company
Oldcastle Infrastructure
- Industry
- Construction
- Location
- Atlanta, US
- Company size
- 1,001–5,000 employees
About Oldcastle Infrastructure
Oldcastle Infrastructure future-proofs North America’s infrastructure and transform communities by protecting water, enhancing communications, transporting energy, and strengthening structures. Our clear vision, powerful collaboration, and fierce drive ensure the vitality and sustainability of what is most important to us—a better planet.
See moreLatest activity
Latest activity from Oldcastle Infrastructure
25 signals
Discover more
Similar signals
Similar public activity from other companies.
Operations & Supply
CCC SITE DEVELOPMENT
CCC Site Development completed the offsite force main and reclaimed water tie-ins, along with the installation of the offsite storm system for the Willamar project.
Operations & Supply
Atlan Stormwater
Atlan Stormwater installed a 485,000 litre On-Site Stormwater Detention OSD tank in a two-day schedule using the Atlan MegaVault.
Operations & Supply
PERI USA
PERI USA deployed the PERI MPS Perimeter Protection System on the Bally's Hotel & Casino project in Chicago, showing up to site on a truck pre-assembled.
Operations & Supply
Superior Construction
Superior Construction is replacing aging metal culverts in Montgomery County, Indiana, with a 48-foot precast concrete box culvert designed to increase water capacity and reduce upstream flooding along SR 32.
Operations & Supply
Baker Construction