Operations & SupplyEvent: September 4, 2026
Osprey Group helped create and deliver a logistics solution for the modular construction programme at Hinkley Point C, enabling offsite manufacture, marine transport, and direct site installation.
Published
Signal category
Operations & Supply
Quote
“the objective remained the same: provide confidence that critical construction materials would arrive safely, efficiently and when needed.”
— Osprey Group team
Company
Osprey Group
Delivering Critical Infrastructure. Better, together.
- Industry
- Engineering Services
- Location
- Portishead, GB
- Company size
- 130 employees
Osprey believes that integrated engineered logistics, on land and by water, can transform the way critical UK infrastructure is built. Combining the very best multi-disciplinary engineering and delivery teams to accelerate projects and enhance safety, Osprey works in partnership with clients to solve the most complex construction challenges.
Founded 1995